[email protected]
iconn1 iconn2 iconn3

Sand Making Machine African Infrastructure Necessary Equipment

2019-6-29- A two-basin sand trap located upstream of the impoundment. Sized to eliminate grains of more than 0.2 mm, it will effectively be 55 m long. The discharge valve will be in a dedicated concrete structure located downstream of the energy dissipation basin, making it possible to transport the sand on the river bed directly

Get Price

What Can I Do For You?

Related News

Copyright © 2020.Fumine Mining Machinery All rights reserved. Sitemap